Single Machine Scheduling: Comparison of MIP Formulations and Heuristics for Interfering Job Sets
by Khowala, Ketan, Ph.D., ARIZONA STATE UNIVERSITY, 2012, 119 pages; 3505375

Abstract:

This research by studies the computational performance of four different mixed integer programming (MIP) formulations for single machine scheduling problems with varying complexity. These formulations are based on (1) start and completion time variables, (2) time index variables, (3) linear ordering variables and (4) assignment and positional date variables. The objective functions that are studied in this paper are total weighted completion time, maximum lateness, number of tardy jobs and total weighted tardiness. Based on the computational results, discussion and recommendations are made on which MIP formulation might work best for these problems. The performances of these formulations very much depend on the objective function, number of jobs and the sum of the processing times of all the jobs. Two sets of inequalities are presented that can be used to improve the performance of the formulation with assignment and positional date variables.

Further, this research is extend to single machine bicriteria scheduling problems in which jobs belong to either of two different disjoint sets, each set having its own performance measure. These problems have been referred to as interfering job sets in the scheduling literature and also been called multi-agent scheduling where each agent's objective function is to be minimized. In the first single machine interfering problem (P1), the criteria of minimizing total completion time and number of tardy jobs for the two sets of jobs is studied. A Forward SPT-EDD heuristic is presented that attempts to generate set of non-dominated solutions. The complexity of this specific problem is NP-hard. The computational efficiency of the heuristic is compared against the pseudo-polynomial algorithm proposed by Ng et al. [2006]. In the second single machine interfering job sets problem (P2), the criteria of minimizing total weighted completion time and maximum lateness is studied. This is an established NP-hard problem for which a Forward WSPT-EDD heuristic is presented that attempts to generate set of supported points and the solution quality is compared with MIP formulations. For both of these problems, all jobs are available at time zero and the jobs are not allowed to be preempted.

 
AdvisersJohn Fowler; Ahmet Keha
SchoolARIZONA STATE UNIVERSITY
SourceDAI/B 73-08(E), p. , May 2012
Source TypeDissertation
SubjectsApplied mathematics; Industrial engineering; Computer science
Publication Number3505375
Adobe PDF Access the complete dissertation:
 

» Find an electronic copy at your library.
  Use the link below to access a full citation record of this graduate work:
  http://gateway.proquest.com/openurl%3furl_ver=Z39.88-2004%26res_dat=xri:pqdiss%26rft_val_fmt=info:ofi/fmt:kev:mtx:dissertation%26rft_dat=xri:pqdiss:3505375
  If your library subscribes to the ProQuest Dissertations & Theses (PQDT) database, you may be entitled to a free electronic version of this graduate work. If not, you will have the option to purchase one, and access a 24 page preview for free (if available).

About ProQuest Dissertations & Theses
With over 2.3 million records, the ProQuest Dissertations & Theses (PQDT) database is the most comprehensive collection of dissertations and theses in the world. It is the database of record for graduate research.

The database includes citations of graduate works ranging from the first U.S. dissertation, accepted in 1861, to those accepted as recently as last semester. Of the 2.3 million graduate works included in the database, ProQuest offers more than 1.9 million in full text formats. Of those, over 860,000 are available in PDF format. More than 60,000 dissertations and theses are added to the database each year.

If you have questions, please feel free to visit the ProQuest Web site - http://www.proquest.com - or call ProQuest Hotline Customer Support at 1-800-521-3042.