Health monitoring of precast bridge deck panels reinforced with glass fiber reinforced polymer bars
by Ries, James McDaniel, M.S., THE UNIVERSITY OF UTAH, 2011, 71 pages; 1491261

Abstract:

The Beaver Creek Bridge on US highway 6 is the pilot project for Glass Fiber Reinforced Polymer (GFRP) bridge decks and posttensioned bridge decks in the state of Utah. The bridge was built in 2009, using accelerated bridge construction practices, including the use of precast prestressed girders, as well as precast decking. The westbound bridge decking was composed of 12 precast panels each measuring 41’-5” long, 6’-10” wide, and 9¼” thick, and weighing approximately 33 kips. At the time, these panels were the longest GFRP panels in the United States.

The Utah Department of Transportation has decided to evaluate GFRP reinforcing bars as an alternative to steel rebar in this bridge deck. The hope is to increase the lifespan of bridge decks to match the service life of the entire bridge. Due to the nature of the GFRP bars, the panels were lifted at four points using straps instead of imbedded anchors. During the four-point lifting, the panels exhibited small deflections and strains; furthermore, no cracks larger than hairline cracks were found in the panels after lifting.

The Beaver Creek Bridge deck is the first precast deck in the state of Utah to be posttensioned in the direction of traffic. Posttensioning bridge decks is expected to become the norm in the state of Utah. The posttensioning resulted in increased continuity between panels.

In order to quantify the expected performance of the bridge during its service life, a truck load test was performed. The truck load test was comprised of a static and dynamic test. During the truck load test, the bridge experienced deflections in the panels which were 93% below design values. Girder deflections were also small.

The use of GFRP bars has the potential to extend the life of bridge decks exposed to deicing salts from 45 years to 100 years, while only requiring an increased capital cost in the bridge of 8%. Furthermore, the use of GFRP bars in conjunction with accelerated building practices has the potential to reduce long-term user delays resulting from maintenance. The difference in capital cost could decrease as designers become more comfortable with the material and gain experience with the system.

 
AdviserChris Pantelides
SchoolTHE UNIVERSITY OF UTAH
SourceMAI/ 49-05, p. , May 2011
Source TypeThesis
SubjectsCivil engineering; Materials Science
Publication Number1491261
Adobe PDF Access the complete dissertation:
 

» Find an electronic copy at your library.
  Use the link below to access a full citation record of this graduate work:
  http://gateway.proquest.com/openurl%3furl_ver=Z39.88-2004%26res_dat=xri:pqdiss%26rft_val_fmt=info:ofi/fmt:kev:mtx:dissertation%26rft_dat=xri:pqdiss:1491261
  If your library subscribes to the ProQuest Dissertations & Theses (PQDT) database, you may be entitled to a free electronic version of this graduate work. If not, you will have the option to purchase one, and access a 24 page preview for free (if available).

About ProQuest Dissertations & Theses
With over 2.3 million records, the ProQuest Dissertations & Theses (PQDT) database is the most comprehensive collection of dissertations and theses in the world. It is the database of record for graduate research.

The database includes citations of graduate works ranging from the first U.S. dissertation, accepted in 1861, to those accepted as recently as last semester. Of the 2.3 million graduate works included in the database, ProQuest offers more than 1.9 million in full text formats. Of those, over 860,000 are available in PDF format. More than 60,000 dissertations and theses are added to the database each year.

If you have questions, please feel free to visit the ProQuest Web site - http://www.proquest.com - or call ProQuest Hotline Customer Support at 1-800-521-3042.